Important Concepts in Time and Work:
If (a person) able to do 1work in “n” days,then (a person 1day work)=[1/n].
If (a person 1day work )=[1/n],
then(a person) finish the work in “n days” .
Explaining Time and Work with example:
Consider kannan(a person) able to do 1work in 1 day.Then kannan able to finish 5works in 5 days.But if1 work in 5 days means it is 1/5 as per concept.Consider kavi able to do half work(i.e 1/2) in 1 day.Then kavi able to finish 1 work in 2 days.So kavi able to finish 5 works in 10 days.But if 1 work in 10days means it is 1/10 as per concept.
Kannan | Kavi |
1st day = 1 work 2nd day = 1 work 3rd day= 1work 4th day= 1 work 5th day= 1 work | 1st day = 1/2 work 6th day = 1/2 work 2nd day = 1/2work 7th day = 1/2 work 3rd day= 1/2work 8th day = 1/2 work 4th day= 1/2 work 9th day = 1/2 work 5th day= 1 /2work 10th day = 1/2 work |
Total=5 works in 5 days | Total=5 work in 10 days |
Why I am mentioning the above ?
Note that if the ability of a person ability is less to finish the work then the days to finish the work wiil be more.
Some tips on Time and Work:
Try to convert the days into (a person 1day work)=[1/n].It will be mostly needed step in maximum problems in this type.Problem on Time and Work:
Question:
A and B together can complete a piece of work in 4 days.If A alone can complete the same work in 12 days,in how many days can B alone complete that work?Solution:
It was given that ,A+B=4days ---------------------------------------------------------------->[Here and means +]
A=12days alone to finish work
Therefore (A+B)one day work------------------------------------------>[As given in concept]
W(A+B) =1/4 ------------------------------------------------------------>[Workdone by A+B in 1day]
WA =1/12----------------------------------------------------------->[Work done by A alone in 1day]
Therefore,
W(A+B) = WA + WB
1/4 = 1/12 +WB
WB = 1/4 _ 1/12-------------------------------------------------->[Work done by B alone in 1day]
WB =1/6
Finally ,B alone can complete the work in 6 days.